Our Design + Build method

From idea to keys. One contract, one point of contact.

Five steps, from feasibility to commissioning. We hold the price and deadline commitment for the entire project: design, execution, handover, warranties. The feasibility visit involves a symbolic contribution, deductible upon signing — terms are specified during the initial call.

Internal ISO 19650 tools (BIM, shared CDE). While the Loi MOP framework (esquisse / APS / APD / PRO-DCE / ACT / DET / AOR) remains a public market reference, for private projects we operate under Architecteurs contracts adapted for Design + Build.

Five stages, written for you (not for us)

How a Xiléades project unfolds, from your side of the desk. These are not the technical phases (sketch, design development, permit...) — these are what you live through, week by week. The technical details are below, for those who want to dig.

01 · Pre-show · 2 to 6 weeks

We understand, you understand

The decoder, Hélène or Alexis replying in person (phone, short video call, or voice note — your choice), the first meeting. You present your project; we share our reading. By the end, you know whether we're going forward together — or not.

Vous recevez :Project synthesis, personal reply from the architect, indicative range.

02 · Signing · One day

A printed log, not an email

When you sign, you receive a printed booklet in person (or by courier): team, milestones, contacts, glossary, contract inside. It's the first physical object of the project — so it starts in your mind, not in your inbox.

Vous recevez :A6 project log, personalised wood object, signed contract.

03 · Build · 3 to 18 months

A 90-second video, every Friday

You can't be on site, and that's normal. Every Friday, Alexis films and sends a vertical video: where we are, what we did this week, the thing that deserves your attention, what's next, honest status. No music. No filter. No app.

Vous recevez :Private weekly video, SMS reminder Friday 6pm, scripted mid-build visit.

04 · Handover · One day

We hand over the keys — properly

Not an email with the technical file. A ceremony: photographer, USB with the full video archive, space staged, plants, fresh bread. You walk into your home for the first time — we want that to be the closing photo you keep.

Vous recevez :In-person handover, full video archive, photographer.

05 · Afterlife · Over 3 years

We come back

Visit at 1 year, visit at 3 years. We look at how the place aged, what works, what we'd do differently. Small gift. No commitment expected from you — it's our standard.

Vous recevez :Two scheduled courtesy visits, direct contact preserved.

Step 01 · Feasibility

Site visit, feasibility study, binding pre-budget.

Indicative duration: 2 to 3 weeks

What we deliver

  • · Dedicated site visit (terms specified during the first call)
  • · Feasibility note: program, administrative constraints, timelines
  • · Realistic pre-budget, consistent with your envelope
  • · Contract proposal (preliminary study or direct Design + Build)

What we expect from you

A written brief, your budget envelope, and the building's history.

Step 02 · Design

Schematic then detailed design, up to the price commitment.

Indicative duration: 8 to 14 weeks

What we deliver

  • · Volumes, plans, facades, structural principles
  • · Shared BIM model (LOD 300, ISO 19650)
  • · Finalized PRO-level plans + descriptive notice (client deliverables at end of design phase)
  • · Estimate by trade and Design + Build price commitment

What we expect from you

Validation at each milestone and arbitration on proposed options.

Step 03 · Permits & Tendering

DP, PC, DAAERP: we file, we consult contractors, we contract.

Indicative duration: 3 to 5 months (including processing)

What we deliver

  • · Permit application file (PC, DP, DAAERP / AT-ERP) — filed after signing the construction contract
  • · Contractor consultation: internal DCE (CCTP + execution plans + schedule) sent only to consulted firms
  • · Contracts signed with selected companies
  • · Single project insurance policy activated

What we expect from you

Availability for potential discussions with the instructor or ABF.

Step 04 · Build / Construction

A single point of contact, price and deadline contractually committed.

Indicative duration: 6 to 18 months depending on program

What we deliver

  • · Weekly site meetings, minutes sent within 48h
  • · Consolidated monthly price / schedule tracking
  • · Integrated multi-trade coordination
  • · Client site visits at each draw request

What we expect from you

Occasional presence at key milestones and validation of any amendments.

Step 05 · Delivery & Commissioning

OPR, utility connections, commissioning, snag list resolution, GPA.

Indicative duration: Handover + 1-year GPA

What we deliver

  • · OPR followed by signed handover certificate
  • · Fluids commissioning, equipment, regulatory checks
  • · Dossier des Ouvrages Exécutés (DOE) delivered
  • · 1-year GPA tracking + decennial / biennial warranty activation

What we expect from you

User feedback to calibrate snag list resolution.

Framework & guarantees

Six concrete commitments.

Construction-defects insurance included

Construction-defects and decennial insurance built into the price

Architects registered with the Order

Members of the Les Architecteurs® network

ISO 19650 method

BIM, shared CDE, clear information levels

Final completion warranty

Defects cleared within 1 year, formalised follow-up

Schedule commitment

Contractual timeline backed by penalties

Financial guarantee

Milestone payments + all-risks site cover + extended PI

Tools

One project, one shared truth.

BIM level LOD 300+

Shared digital model, conflict detection before construction, reliable surveys.

ISO 19650 compliant CDE

Common Data Environment: a single space for all documents, tracked versions.

Weekly reporting

Structured minutes within 48h, quantified progress indicators, no guesswork.

Single contractual commitment

One price, one deadline, one site insurance policy, one decennial warranty. Aligned with Architecteurs cooperative contracts.

Project decoder

Start my project

4 minutes. 6 questions. A personal reply from Hélène or Alexis within 24 working hours.

Why 4 minutes instead of a contact form?

Because the person who calls you back is not a salesperson — it is the architect who will draw your project. We want to understand before we propose a meeting, not the reverse.

We answer personally within 24 working hours. Phone, short video call, or voice note — your choice.